Copyright 2024 - © CAUC 2017

17th January 2023

Exciting evening tonight as it's all hands on deck as we continue working on the new car! 

We started with preparing the mould that will form the top part of the car. This involved applying one layer of Easy Lease onto the mould before waiting ten minutes for it to gas off (essentially this means letting the solvents evaporate.) We completed this process another 6 times until we have achieved the coverage required. 

vacum 2

 Meanwhile, a number of our team were getting a masterclass from Nigel on the lathe! Using engineering drawings, we have been working on the lathe to make a holder for the bush for the steering. 

YAZZZZZ

 

One more fantastic night with the team. We can't wait until next time. See you then!